Standards-based analysis, rigorous QA, comprehensive documentation
How AES scopes, documents, and reviews electrical engineering work from kickoff to issue.
The principles we engineer by
How we document decisions, assign responsibilities, and consider how facilities operate.
Defensible Engineering
Document the engineering methods, key inputs, assumptions, and limits behind findings and recommendations.
Risk & Responsibility
Identify the responsible engineer and agree on who coordinates with the owner, utility, and authority having jurisdiction.
Lifecycle Thinking
Consider expected operating conditions, future loads, maintainability, and maintenance requirements where relevant to the scope.
Grounded in the codes that matter
Requirements depend on jurisdiction, facility, equipment, and scope. These references are examples.
- NFPA 70 (NEC)
- NFPA 70B
- NFPA 70E
- IEEE 1584
- ANSI/IEEE C37 Series
- AHJ Coordination
- Utility Interconnection
- State / Municipal Amendments
- Facility-Specific Standards
Review before issue
Review and sealing requirements are established for each engagement.
Technical Review
Check inputs, assumptions, methods, and deliverables. Assign independent review when required by the applicable rules, contract, or agreed scope.
Applicable Requirements
Identify the governing standards and editions, jurisdictional requirements, and owner criteria for the specific work.
Constructability Review
Where the scope calls for it, assess installation constraints, coordination with other trades, and maintainability.

Documentation that lasts
Deliverables reflect the agreed scope, findings, assumptions, and limitations.
- Study reports, sealed when required and permitted
- Single-Line & System Diagrams
- Equipment Specifications
- Compliance & Label Documentation
From scope to issue
The schedule is agreed for each project based on scope, records, site access, and review requirements.
- 1
Project Initiation
Confirm scope, engineering responsibility, authorization, and the inputs needed.
- 2
Information Gathering
Review available drawings, equipment records, and utility data. Define field verification and access where needed.
- 3
Analysis & Engineering
Check inputs, perform the agreed analysis, and document assumptions and limitations.
- 4
Deliverable Preparation
Prepare the agreed reports, drawings, or label schedules and complete the applicable reviews.
- 5
Client Review & Finalization
Address agreed comments and issue deliverables after the required review and authorization.