Electrical engineering for facility power decisions

Plan equipment changes, evaluate electrical safety, and set maintenance priorities with analysis grounded in your facility.

Request a Consultation

Core engineering services

Start the eight-question check

Use existing records for one facility. Your answers stay on this page. This check does not determine electrical safety or compliance.

Do you have a dated one-line diagram that reflects equipment, power sources, and connections currently in service?
Do you have an equipment inventory with IDs that match field tags and dated condition records?
Do you have a written maintenance plan with tasks, intervals, and an assigned owner?
Can you locate dated inspection, service, and test records by equipment ID, including outstanding work?
Can you locate the applicable arc flash assessment and evidence that its basis was reviewed against the current system?
Do existing records show that required arc flash labels are legible and traceable to the equipment and assessment?
Can you locate the employer’s electrical safe-work procedures and training records for the tasks workers perform?
Are findings assigned and tracked, and do equipment, settings, or source changes trigger a review of affected records?
0 of 8 answered

Project examples and credentials

See what AES documents in the field and in design packages.

Measured current for a load-capacity evaluation

Line chart of current in amperes versus elapsed monitoring time, with the highest interval average marked
Measured current on one monitored phase over about 15 days, shown as nominal five-minute averages. The marked peak is the highest interval average.Horizontal axis: elapsed monitoring time (days). Vertical axis: interval-average current (A).

Standby-power one-line riser

Redacted standby-power electrical one-line riser with five numbered callouts listed below
Redacted one-line riser from a coordinated electrical and structural permit drawing package for a standby-power installation.
  1. Standby generator
  2. Utility meter
  3. Fused disconnect switch
  4. Automatic transfer switch
  5. Manual transfer switch
See the full drawing example
Explore project types

Electrical Design & P.E.-Sealed Construction Documents

AES prepares electrical permit and construction drawings in AutoCAD for facility upgrades, standby power, and electrical distribution projects. Deliverables may include one-line diagrams, equipment layouts, and schedules. AES confirms sealing requirements and licensure for the project location during scoping.

Explore electrical design
  • Georgia engineering firm

    Atkins Engineering Solutions · PEF008364

  • Minority Business Enterprise

    NMSDC certification through May 31, 2027

  • Federal procurement

    UEI, CAGE code and primary NAICS

See credential details and individual licensure

How AES works

AES documents what’s installed, models how it behaves, and explains what to address before adding load or changing equipment.

Explore power system studies

12-second animation · Illustrative system diagram

Document

Identify the equipment and loads that serve the facility.

Analyze

Trace service through switchgear to loads. Model the change and review protection.

Decide

Use the findings to plan what to verify before the next upgrade.

Planning a facility power change?

Tell us what is changing, what your team needs to decide, and when.